Standard objects

Opportunities

Sales projects — with stage, value, health, BANT, and checklist steps.

An opportunity (opportunity in the API, opp for short) is a sales project you run with a company. The UI calls it a Project (Proje) or an Opportunity (Fırsat). Every opportunity belongs to a company, sits in a stage, and moves forward through stage gates until it closes.

Stages

Stages vary by installation (Settings → Stages (Ayarlar → Aşamalar)). New installations start with two open stages (Aday · Devam ediyor, meaning prospect and in progress); industrial installations such as Makro use five open stages and stage gates:

Qualify → Viable → Present Solution → Negotiation → Expect to Close → Win / Lost / Cancel

The closing keys are Win, Lost, and Cancel on every installation; their display names can differ. The installation's stage keys and names are returned in constants.stages, constants.open_stages, and constants.stage_labels in the GET /api/v1/me response. Details: Stages and gates.

Account follow-up containers

The ongoing relationship with won customers is kept in Account Follow-up (Müşteri Takibi) containers in the Account stage. These containers don't count toward the sales pipeline, and visits and orders link to them. Fetch them from the list with stage=account; they carry is_account: true.

Fields

Field Type Description
id, rid integer, string ID and permanent record ID (006…).
name string Display name (generated from the product and type if there's no name).
customer_id, customer integer, string Company.
stage, stage_label string Stage key and display name.
is_open, is_account boolean Open opportunity · account follow-up container.
potential_kg, offer_price, payment_days number Monthly volume, unit price, payment term.
unit, pu, cur_sym string The product's unit, price unit (e.g. €/kg), and currency symbol.
value, value_short number, string Annual value = volume × price × 12 (otherwise the manually entered value).
value_base, base_currency number, string The value converted to the installation's base currency.
probability, prob, fc number, string Probability (%) and forecast category.
health, health_color object, string Health score and color (g green, y yellow, r red).
health_manual, health_note boolean, string Whether the user set the color manually, and their note.
sla_days, sla_left, days_in_stage integer Stage duration target, days left, days spent in the stage.
lifetime_left integer Days left in the project's lifetime.
next_step, close_date string, date Next step and expected close date.
bant integer Number of BANT criteria met (0–4).
owner user Owner.

The single-record endpoint also returns steps (checklist), gate_ok, gate_problems, next_stage, bant_b/a/n/t, offers, visits, demos, orders, tasks, logs (stage history), notes, tags, threads, and, if the opportunity is closed, close_category, close_reason, and closed_at.

How value is calculated

If a product, monthly volume, and unit price are set, the annual value is volume × price × 12 and can't be edited manually. Otherwise, the manually entered value in the value field is used. Dashboards and totals are always calculated with value_base, in the base currency.

Health

The health score (0–100) is calculated automatically. Exceeding the stage SLA or the project lifetime, time since the last activity, the next step's date and postponements, a close date in the past, stage gate problems, and a missing quoted price during negotiation lower the score; activity in the last 7 days and a positive trial raise it. 75 and above is green, 50–74 is yellow, and anything lower is red. Users can pick the color manually and write a short note; a manually chosen color overrides the calculated one (health_manual: true). sort=health sorts the list with red opportunities first.